South Korea's sole aircraft manufacturer responsible for the KF-21 Boramae next-generation fighter, the FA-50 light combat aircraft, the T-50 supersonic trainer, and the KAI Surion utility helicopter.
Korea Aerospace Industries is a South Korean defense company based in Sacheon, founded in 1999. 11 export contracts worth $11.8B with Indonesia, Poland, Iraq and 5 more. Makes FA-50 Fighting Eagle, KF-21 Boramae, T-50 Golden Eagle and 2 more systems.
Malaysian Defence Minister Mohamed Khaled Nordin told the Dewan Rakyat during the budget debate on October 26, 2026 that the Royal Malaysian Air Force will receive its first two FA-50M Block 20 light combat aircraft from Korea Aerospace Industries on Friday, October 30, strengthening Malaysia's air combat capability. The jets are the first deliveries under the 4 billion ringgit (about 1.3 trillion won) contract for 18 aircraft signed with KAI in May 2023; six are to arrive by the end of 2026 and the remaining 12 by March 2028. Kuantan Air Base in Pahang will be the main operating base, with some aircraft stationed at Labuan in Sabah for air defense duties. Malaysia is reported to be weighing a second purchase of 18 more FA-50Ms under its CAP55 modernisation plan, with negotiations expected to open, and KAI has offered beyond-visual-range air-to-air capability including AMRAAM integration to expand the aircraft's combat role.
Hanwha Aerospace filed a correction disclosure with the Financial Supervisory Service on October 22, 2026 raising the value of its contract with Korea Aerospace Industries to supply 17 types of initial mass-production parts for the KF-21 fighter from 473.1 billion won to 531.4 billion won, an increase of about 58.3 billion won, following a revised contract. The contract runs from November 25, 2024 to June 30, 2028 and now equals 5.68 percent of the reference-year consolidated revenue of Hanwha Aerospace, up from 5.06 percent; amounts include VAT. The amendment comes as KAI delivers the first Block I production aircraft to the Republic of Korea Air Force, with eight due by the end of 2026.
The Public reported on October 22, 2026 that Hanwha Aerospace, Hyundai Rotem, LIG D&A and KAI together signed six overseas weapons contracts worth 100 billion won or more in the first ten months of 2026, totalling about 4.4 trillion won, against roughly 17 trillion won for the four firms in all of 2025. Hanwha Aerospace accounted for five of the six, centred on K9 howitzers and Chunmoo launchers including the April Finland K9 follow-on, and LIG D&A for one, the roughly 140 billion won Haegung ship-to-air missile export to Malaysia. Hyundai Rotem has no large overseas booking as its Peru K2 follow-on is delayed by budget and political conditions, and KAI has none since the 2025 Philippine order for 12 FA-50s. The article flags the LIG D&A bidding ban as a constraint on domestic programs such as the 1.9 trillion won KF-21 long-range air-to-air missile, notes that KAI lost last year helicopter upgrade and electronic warfare competitions, and attributes the slowdown to easing post-Ukraine demand as European states expand their own production and to heavy reliance on the K2, K9 and Chunmoo, urging diversification into unmanned and AI-based systems.
At the Strategy and Finance Committee audit of the Export-Import Bank of Korea on October 20, 2026, KEXIM president Hwang Ki-yeon said the bank has no current plan to sell its 26.41 percent stake in Korea Aerospace Industries and that a sale was not the premise of a 1.8 billion won aerospace competitiveness consulting contract whose timing lawmakers had linked to Hanwha Group raising its holding to 15.89 percent, while adding that future plans could not be ruled out. KAI president Kim Jong-chul, appearing as a witness, said the governance of KAI would not change without the consent of its members, that everyone wants KAI but not just anyone can have it, and that while Hanwha cannot be stopped from buying shares on the exchange, taking management control is practically difficult and would risk a monopoly that shrinks the aerospace ecosystem. He confirmed working-level discussions on information access for Hanwha management participation but said no formal written request had been made. Committee chair Cho Seung-rae warned that Hanwha could become the largest shareholder through allied holders and urged monitoring. KED Global described the statements as a fresh setback for Hanwha plans to assemble a Korean counterpart to Lockheed Martin.
Korea's four major defense contractors are expected to post combined third-quarter 2026 operating profit of about 1.68 trillion won, down 4.1 percent from the previous quarter, Global Economic reported on October 18, 2026, as Polish export shipments slipped into October and delayed revenue recognition while a stronger won squeezed export margins. Brokers cut target prices across the board for Hanwha Aerospace, LIG Defense & Aerospace and Hyundai Rotem in mid-October, with Asia Business Daily noting that major year-end events such as Saudi, Romanian and Iraqi decisions remain the catalysts. Korea Investment & Securities forecast Hanwha Systems third-quarter revenue of 1.15 trillion won and KAI revenue of 1.20 trillion won. Hyundai Rotem's preliminary results on October 19 came in below the 268.6 billion won operating profit consensus. Hanwha Aerospace reports on October 30.
Defense Acquisition Program Administration Minister Lee Yong-cheol told the National Assembly audit on October 13, 2026 that a potential Hanwha takeover of Korea Aerospace Industries has both advantages and drawbacks and that it would be premature to set a direction, adding that any move would be closely examined in terms of national security and the national interest. Hanwha Group holds 15.89 percent of KAI after the Korea Fair Trade Commission cleared its stake increase in late August, while the Export-Import Bank of Korea remains the largest shareholder with 26.41 percent. Under the Defense Acquisition Program Act a change of control at a designated defense contractor requires approval from the Minister of Trade, Industry and Energy, and KAI's labor union marched on the National Assembly on October 14 in opposition.
Korea Aerospace Industries said on October 8, 2026 that it is the only Korean exhibitor at the Marrakech Air Show (October 7 to 10), where it set aside a dedicated FA-50 display aimed at the Royal Moroccan Air Force's advanced trainer and light combat aircraft requirement to replace ageing Alpha Jets and Northrop F-5s. KAI signed a memorandum of understanding with Moroccan maintenance providers Maintenance Aero Maroc and Sabca Maroc to explore industrial cooperation around a T-50 and FA-50 offer. Morocco's minister delegate for national defence administration, Abdellatif Loudiyi, and senior air force officers visited the KAI stand. Leonardo's M-346 is the main competitor. KAI positions Morocco as its gateway to African markets; no contract has been awarded.
|Asia Business Daily / Aviation Week / Zone Militaire
Malaysian Defence Minister Mohamed Khaled Nordin said in October 2026 that the Royal Malaysian Air Force expects to receive its first FA-50M light combat aircraft this month or next, with no delays reported by Korea Aerospace Industries. The RMAF chief had earlier set the first two aircraft for October 2026, with the remaining jets of the 18-aircraft order arriving in stages through March 2028, later than KAI's original mid-2027 schedule. The jets will be based with No. 15 Squadron at Kuantan Air Base, whose upgraded facilities were reported more than 90 percent complete in June; the first two Malaysian pilots finish conversion training in October and four more in December. Malaysia holds an option for 18 additional FA-50Ms. As of October 20 no arrival ceremony had been reported.